Safety & Workforce Standards

Experience Does Not Replace Site Requirements.

Industrial work depends on competence, clear responsibility and respect for the procedures governing the site.

ROC Workforce's public safety position is simple: the worker, the role and the project requirements have to fit each other.

01 /

Safety Is Part of Role Fit

A person is not project-ready simply because they have performed a similar job before.

Project readiness may depend on:

  • client orientation;
  • equipment-specific procedures;
  • applicable credentials;
  • PPE;
  • site access;
  • role-specific training;
  • jurisdictional requirements;
  • project-specific safe work procedures.
02 /

Say What You Know. Prove What Matters.

ROC's workforce model is built around recording relevant experience and, where required, verifying the documentation or references behind critical claims.

Higher-risk or leadership roles should carry a higher evidence standard than an initial worker profile.

03 /

Site-Specific Requirements

The client controls its site and operating procedures. ROC personnel are expected to work within the requirements defined for the project and their role.

Site-specific orientation, permits, access rules, training and operating procedures may vary by location.

04 /

Know the Boundary of the Role.

Operational experience does not authorize a worker to perform regulated work outside their qualifications.

Electrical, welding, mechanical or other specialist work must be assigned to appropriately qualified personnel where the project or jurisdiction requires it.

05 /

PPE Requirements

Personnel must meet the PPE requirements applicable to the site and role.

06 /

Credentials

Required training and credentials depend on the role, client, site and jurisdiction.

07 /

Client Responsibilities

Safety depends on both workforce and project structure. Client-side information may include:

  • site orientation;
  • local procedures;
  • equipment-specific requirements;
  • required training;
  • restricted tasks;
  • emergency procedures;
  • specialist trade boundaries.
08 /

Have Site-Specific Requirements?

Include them with the workforce request so role and project requirements can be reviewed together.